High Level Bridge

Case Study: Documenting Maintenance Work on the High-Level Bridge in Newcastle

Client:
AMCO Giffen, a leading civil engineering company, undertaking maintenance work on the historic High-Level Bridge in Newcastle.

Objective:
The aim was to capture the extensive maintenance efforts on the High-Level Bridge, emphasizing the scaffolding and engineering marvels involved, as well as showcasing the workers in action.

History of the High-Level Bridge:

The High-Level Bridge, an iconic structure in Newcastle upon Tyne, was designed by the renowned engineer Robert Stephenson. Construction began in 1847 and was completed in 1849. The bridge was a significant development in Victorian engineering, featuring a double-deck design that carries both rail and road traffic. Over the years, the bridge has undergone several maintenance and restoration projects to preserve its structural integrity and historical significance.

Approach:
The project focused on capturing the maintenance activities, scaffolding setup, and workers in action. Here’s how we executed it:

  1. Initial Consultation: We met with AMCO Giffen’s project managers to understand the scope of the maintenance work and identify key elements to be documented.
  2. Scaffolding Photography: The extensive scaffolding setup beneath the bridge’s deck was a major focal point. We captured detailed images from multiple angles:
    • Deck Level: Close-up shots of the scaffolding, highlighting the complexity and precision of the construction.
    • Riverside View: Wide-angle shots from the Quayside, showcasing the vertical poles attached to the bridge’s archways and the suspended lower platform.
  3. Work in Progress: We documented the maintenance activities, with a particular focus on:
    • Painting Existing Metalwork: Images of workers painting the metal structures, illustrating the careful restoration process.
    • Engineers at Work: Photos of senior engineers conducting inspections emphasising safety and diligence.

Challenges:
Capturing the intricate scaffolding setup and the workers’ activities from various challenging angles required meticulous planning and safety precautions. Ensuring we accurately conveyed the scale and complexity of the engineering work was paramount.

Results:
The final photographs provided a comprehensive visual record of the maintenance project. The images highlighted the engineering achievements and the efforts of the workers, offering AMCO Giffin valuable material for documentation and promotional purposes.

Conclusion

The High-Level Bridge maintenance project illustrates the crucial role of photography in documenting complex engineering feats. By capturing the meticulous work of AMCO Giffen and the impressive scaffolding setup, we’ve created a visual narrative that celebrates both the historical significance of the bridge and the modern engineering efforts to preserve it. This case study underscores the importance of professional photography in showcasing the dedication and expertise involved in large-scale maintenance projects.

Privacy Settings
We use cookies to enhance your experience while using our website. If you are using our Services via a browser you can restrict, block or remove cookies through your web browser settings. We also use content and scripts from third parties that may use tracking technologies. You can selectively provide your consent below to allow such third party embeds. For complete information about the cookies we use, data we collect and how we process them, please check our Privacy Policy
Youtube
Consent to display content from - Youtube
Vimeo
Consent to display content from - Vimeo
Google Maps
Consent to display content from - Google